No Comments
Tower Bridge Closure  – CS7 fail!

Heavy traffic on Southwark bridge as a consequence of the Tower Bridge closure. The cycle path works perfectly but the nose to tail vehicles and parked coaches on the south side are making life challenging for cyclists. People are taking to the pavement rather than queue and mix it with the trucks.

Police presence needed here as well as stopping cycling on Tower Bridge – if CS7 was safer more would use it

southwark_bridge_southbound_10_2016_002

southwark_bridge_southbound_10_2016_001

Submit a Comment